Turnkey Project Industrial Building incl. substructure and ground works. The facility includes a production hall with office, canteen, reception, 6 no’s overhead cranes with a capacity of 500 ton each and all necessary infrastructures.
Production hall: 52,000 m²
L=330 m, W=156 m (3 sections), H=30 m
Crane beam head 20 m
Structural steel 14,000 tons
(structure 10,000 tons and overhead crane beams 4,000 tons)
Production hall: 52,000 m²
L=330 m, W=156 m (3 sections), H=30 m
Crane beam head 20 m
Structural steel 14,000 tons
(structure 10,000 tons and overhead crane beams 4,000 tons)