Construction of Ethane Cracker and HDPE & PP Plant for “Turkmengas” State Concern started in Kiyanli, Balkan Region in 2015. The project was implemented by Consortium of companies comprising Hyundai Engineering Corp., LG International Corp. and Toyo Engineering Corp. Hyundai Engineering Corp. signed a Subcontract Agreement with Rönesans Endüstri Tesisleri İnşaat Sanayi ve Ticaret Anonim Şirketi for construction of the following units of the Plant:
• GSU (Gas Separation Unit); 5 BCMA Gas feed
• HDPE (High Density Polyethylene): 386 kTA
• Onshore and Offshore Works of Sea Water Intake Facility
Rönesans carried out civil works, steel structure erection, piping and equipment erection of the above units.
• GSU (Gas Separation Unit); 5 BCMA Gas feed
• HDPE (High Density Polyethylene): 386 kTA
• Onshore and Offshore Works of Sea Water Intake Facility
Rönesans carried out civil works, steel structure erection, piping and equipment erection of the above units.