The management, planning and technical processes of the project that was completed in Poland for Elektrownia Kozienice was carried out by Rönesans.
The management, planning and technical processes of the project that was completed in Poland for Elektrownia Kozienice was carried out by Rönesans.
Constructed within the scope of 1,000 MW (megawatt) capacity power plant, the height of the tower is 185.1 meters and water flow rate is 100,340 cubic meters. The project was constructed between 2013-2015.
System:Hamon
Performance:1,000 MW
Water Flow Rate:100,340 m³/h
Base Diameter:135,40 m
Height:185,10 m
Constructed within the scope of 1,000 MW (megawatt) capacity power plant, the height of the tower is 185.1 meters and water flow rate is 100,340 cubic meters. The project was constructed between 2013-2015.
System:Hamon
Performance:1,000 MW
Water Flow Rate:100,340 m³/h
Base Diameter:135,40 m
Height:185,10 m