Construction of a three-steel construction hall with gantry crane tracks (L=350 m, W=100 m, H=22 m) with the associated auxiliary buildings and facilities, such as switchgear, water management, pipe bridges and all necessary ancillary services. All construction works (including civil, steel structure, mechanical, piping and E&I works), except for process equipment.
Concrete: 48,000 m³
Reinforcement steel: 5,500 t
Bored piles: 550 pieces
Steel construction: 13,000 t
Earthworks: 100,000 m³"
Concrete: 48,000 m³
Reinforcement steel: 5,500 t
Bored piles: 550 pieces
Steel construction: 13,000 t
Earthworks: 100,000 m³"