Verkhnebakansky Cement Factory

The project aims to increase the annual capacity of the cement production factory to 2.3 million tons (6.500 tpd clinker). Carried out over a 416.500 square meter area, the project was run in two phases and completed in 2012.

Building - Infrastructure

Project Status:

Completed


Year:

2009 - 2012


Area:

416.500 m²


Location:

Novorossiysk, Russia


The project aims to increase the annual capacity of the cement production factory to 2.3 million tons (6.500 tpd clinker). Carried out over a 416.500 square meter area, the project was run in two phases and completed in 2012.

The project includes 7 silos and cement production buildings and units as well as a preheater, stone crushers, mills, proportioning units, kilns, chillers, electro filters, packaging units, truck and carrier loading areas, storehouses, conveyors, galleries and other annexes.

The reinforced concrete production in the facility amounts to nearly 120 thousand cubic meters.