Butendiek Open Sea Wind Farm

The project was completed in Rügen, Germany, in 2014.

Building - Infrastructure

Project Status:

Completed


Year:

2014


Area:

288 MW


Location:

Rügen, Germany


The project was completed in Rügen, Germany, in 2014. The wind farm is in 32 km distance to the coast with a water depth between 17 and 22 meters.

A total of 80 wind turbines are available in the wind farm, with 3.6 MW power each, totaling 288 MW.


OTHER PROJECTS